WATER RESOURCE RESTORATION PROGRAM

Projects Done:
• Cleaning and desilting of Parvathy Puthanar (Kovalam – Akkulam reach), Thiruvananthapuram District, Kerala (Total Length – 16.5 kms, Width – 10m to 60m)
• Cleaning and desilting of Canoly Canal (Kallai to Eranjikkal reach), Kozhikkode District, Kerala (Total length – 11.5 kms, Width – 8m to 30m)
• Deweeding of Bellandur Lake, Bangalore
• Deweeding of Vellayani Lake, Trivandrum
• Grass Cutting in the slushy marsh land inside Cochin International Airport Limited (CIAL) Operational area
• Weed Cutting & Clearing of Chengal Thodu, Near CIAL, Kochi
• Harvesting of Pokkali from Paddy Fields from Ezhikkara, Ernakulam
• Weed Cutting and Clearing of Canal at Thottara Puncha, Amballur, Ernakulam

MARINE PROJECTS CONSULTANCY

Projects Done:
• Cochin Port Trust, Kochi High Seas Ltd.
• Techno-Econo feasibility studies Ras Tanura, Saudi Arabia Onshore and offshore consulting, V-Ships,
• Chennai Supervision of Dry Docking and Major Repairs of Ships, Port Superintendency, Vessel upgrading etc.
• Project on Flood Management for Cochin International Airport along with international Partner Witteveen+Bos International Project B.V.

SHIP BUILDING & REPAIRS

Projects Done at Cochin Shipyard Ltd, Cochin:
• Hull Fabrication and Erection of Fast Patrol Vessels, Multiple Platform Vessels
• Fabrication, Erection and Commissioning of piping systems
• Outfit work, piping system erection, gas turbine ducting and STP erection onboard Aircraft Carrier.
• Testing and commissioning of all shipboard machinery for two, 120T Anchor Handling Towing Supply vessels
• Outfit Work and Piping System Erection of 500 Pax Cum 150T Cargo Vessel

Projects Done at L&T Ship Building, Kattupalli, Tamil Nadu
• Fabrication and Erection of Aluminum Hull, Super structure and Outfit works on three no’s Interceptor Boats for Indian Coast Guard. (Dry weight of Hull & SS: 20 tons)
• Fabrication and erection of Stainless steel pipes and fittings on two Aluminium IB’s
• Erection and commissioning of all equipment’s on board for two Aluminium IB boats
• Fabrication and Erection of various piping systems on Commercial vessels for the Oil & Gas sector.
• Platform Support Vessel – 1, 2, 3 & 4 Anchor Handling Towing & Supply vessel
• Hull unit fabrication for PSV’s 3, 4, & 5 vessels
• Complete Machinery erection and commissioning for one PSV & one AHTS vessel
• Also involved in their Ship repair activities in Hull and Piping sections

Call Us